- What the NAHB breakdown actually measures
- The three pieces of a home’s sale price
- Where the rest of the sale price goes
- Inside construction costs: the eight stages
- Interior finishes, the largest slice
- Major systems rough-in
- Framing and the stud-by-stud math
- Exterior finishes
- Foundations and where the concrete math fits
- Site work
- Final steps
- Other costs
- Why foundations run 10 percent and framing runs 17
- The finished lot’s share of the price
- Builder profit, the margin line
- Turning the percentages into dollars
- How the split moves by region, size, and finish level
- What the NAHB survey includes and leaves out
- Using this breakdown to check a quote or a bid
- Common misreadings of a cost breakdown like this
- The cost breakdown checklist
- The bottom line
Construction costs account for 64.4 percent of a home’s final sale price, according to the NAHB’s 2024 Cost of Constructing a Home survey, the National Association of Home Builders’ periodic look at how a single sale price splits across the pieces that produce it. A finished lot runs 13.7 percent and builder profit runs 11.0 percent, and inside that 64.4 percent construction slice, eight stages divide the work from site clearing to final cleanup. That split is one of the few figures in home building that almost nobody sees whole: a buyer sees a closing price, a builder sees a chain of trade invoices, and a bank sees a draw schedule, and none of those views lines construction up against land and profit the way this survey does.
What follows is the full eight-stage breakdown with every published share, plus where each stage’s percentage actually lands in a project you can measure yourself: the concrete and rebar inside the 10.5 percent foundations share, the stud count inside the 16.6 percent framing share, the paint and drywall inside the 24.1 percent interior finishes share. Run your own illustrative construction number through the calculator on this page and every section below updates to show what that number means stage by stage, using the same NAHB percentages throughout.
One number this breakdown will not give you is a single national average total price, because the NAHB survey publishes shares of a price rather than one headline dollar figure, and a figure confident enough to post here without naming the home size, region and finish level behind it would not be honest. Where a dollar example helps make a percentage concrete, it is marked illustrative and built from a budget you choose, never presented as the survey’s own number.
Key takeaways
- Construction costs run 64.4 percent of a home's sale price, a finished lot runs 13.7 percent, and builder profit runs 11.0 percent, per the NAHB's 2024 Cost of Constructing a Home survey.
- Inside that 64.4 percent, eight stages split the work: interior finishes lead at 24.1 percent, then major systems rough-in at 19.2, framing at 16.6, exterior finishes at 13.4, foundations at 10.5, site work at 7.6, final steps at 6.5, and other costs at 2.1.
- Framing outweighs foundations by more than half again, 16.6 percent against 10.5, because framing buys lumber, labor hours and dozens of trade touches across the whole shell while a foundation is a shorter, more standardized concrete pour.
- These are survey-wide shares from a national sample, not a quote for any one house, so the companion calculator applies them to a budget you set rather than a number this breakdown invents for you.
- The three top-level shares add to 89.1 percent, not 100, because overhead, financing and sales costs sit outside construction, lot and profit and are not broken out in the figures confirmed here.
What the NAHB breakdown actually measures
The NAHB, the National Association of Home Builders, surveys its own builder members periodically on how a home’s sale price breaks down, and the 2024 edition of that work is published through the association’s Eye on Housing economics blog under the title Cost of Constructing a Home. The method behind the figures is builder self reporting on a representative sample rather than a government census, which matters for how much weight to put on any single decimal point. A survey average is a genuinely useful planning figure, and it is a different kind of number than a verified transaction record or an appraisal database.
Every percentage used on this page traces back to that one survey and nowhere else. No other source, no other year, and no sub category percentage beyond the ones the survey publishes is used here, because stacking figures from different surveys or different years produces a breakdown that looks precise while actually comparing incompatible numbers. If a figure you are looking for is not on this page, the honest answer is that it was not confirmed from the primary source, not that it was rounded off or estimated.
Reading the breakdown correctly starts with keeping two different hundred percent totals straight. The first hundred percent is the full sale price, split three ways into construction, lot and profit. The second hundred percent is the construction slice alone, split eight ways into the stages below. A stage percentage like framing’s 16.6 is a share of construction costs, not a share of the sale price, and confusing the two is the single most common misreading of a chart shaped like this one, covered again later in this breakdown.
The three pieces of a home’s sale price
A home’s final sale price splits three ways in the NAHB survey: construction costs, the finished lot, and builder profit. Construction costs are by far the largest piece at 64.4 percent, the finished lot sits at 13.7 percent, and builder profit sits at 11.0 percent.
| Component of sale price | Share, NAHB 2024 survey |
|---|---|
| Construction costs | 64.4% |
| Finished lot cost | 13.7% |
| Builder profit | 11.0% |
The three published pieces of a sale price
NAHB's 2024 Cost of Constructing a Home survey. Bars scaled to the largest share, construction costs.
Each bar is that share divided by construction's 64.4 percent, so the lot draws at about 21 percent of the construction bar's length and profit at about 17 percent. The three bars do not visually sum to anything, since each is scaled to the largest value rather than to each other.
Construction costs are the physical work of building the house, covered stage by stage further down this breakdown. The finished lot is the land plus the work that makes it buildable. Builder profit is the margin the builder keeps on the sale, measured here as a share of the final price rather than as a markup on cost, a distinction worth sitting with because the two numbers are not interchangeable and get swapped in conversation constantly.
Where the rest of the sale price goes
Add 64.4, 13.7 and 11.0 together and the total is 89.1 percent, not 100. That gap is not an error in this breakdown, and it is worth stating plainly rather than quietly rounding past it: the NAHB’s published top line shares do not claim to exhaust the sale price on their own.
The remaining roughly 10.9 percent is the part this breakdown will not assign a specific figure to, because no further split of it was confirmed from the primary source today. In general terms, a builder’s income statement commonly carries cost categories outside construction, land and bottom line profit, things like general and administrative overhead, financing costs on the construction loan, and sales and marketing expense including any commission paid to move the finished home. That is a description of how builder accounting is typically structured, not a claim about what share each of those categories takes in this specific survey, and no percentage is attached to any of them here.
Readers who want the itemized treatment of that remaining share should go to the NAHB’s own published materials directly, through nahb.org or the Eye on Housing blog, rather than treat a guess posted on a materials site as equivalent to the source. Refusing to fill that gap with an invented number is the more useful answer than a confident wrong one.
Inside construction costs: the eight stages
Construction costs split into eight stages in the NAHB survey, and these eight percentages are shares of the construction total, not of the full sale price. They sum to 100 percent of construction costs exactly.
| Construction stage | Share of construction costs |
|---|---|
| Interior finishes | 24.1% |
| Major systems rough-in | 19.2% |
| Framing | 16.6% |
| Exterior finishes | 13.4% |
| Foundations | 10.5% |
| Site work | 7.6% |
| Final steps | 6.5% |
| Other costs | 2.1% |
Construction costs by stage
NAHB's 2024 Cost of Constructing a Home survey. Segments sum to 100 percent of construction costs.
Ordered largest to smallest, interior finishes through other costs. The top three stages alone, interior finishes, systems rough-in and framing, already account for about 60 percent of every construction dollar.
The eight stages below each get their own section, with what the category generally covers, where the NAHB figure stops and this site’s own material math picks up, and why a stage with more trades and more square footage tends to outrank a stage with a bigger single pour.
Interior finishes, the largest slice
Interior finishes is the largest construction stage at 24.1 percent, and the category generally spans everything that turns a closed in shell into a livable, finished interior: drywall, interior paint, trim and millwork, flooring, cabinetry, countertops, and the fixtures that get set once the rough systems are closed up behind the walls.
Why this stage sits ahead of every other one is less about any single expensive item and more about multiplication. A framing crew runs a largely repeated operation across the whole shell, but interior finishes layers several separate trades, drywall hangers, tapers, painters, flooring installers, cabinet installers, trim carpenters, into the same square footage, each billing its own material and labor line. Material coverage is also where this site’s own calculators carry the stage forward: our drywall sheet count manual, paint coverage manual and tile count manual each run one piece of this 24.1 percent on a room you measure yourself, and our material coverage reference gathers the yield and coverage figures that feed every one of those pieces.
Major systems rough-in
Major systems rough-in, meaning electrical, plumbing and HVAC, is the second largest construction stage at 19.2 percent. Rough-in is the phase where wiring, pipe and ductwork get installed inside open stud bays before drywall closes the walls, which is why these three systems get grouped into one stage in the survey rather than tracked separately: they compete for the same open framing cavities and generally happen on an overlapping schedule.
This is the one major stage on the list without a dedicated calculator on this site, and that gap is worth naming rather than papering over with an invented tool. Electrical, plumbing and HVAC rough-in pricing depends on licensed trade quotes, local code requirements and equipment selection far more than it depends on a measurable quantity like square footage or linear feet, which is exactly the kind of number this breakdown will not fabricate. Our contractor estimate manual covers how to structure a trade quote line, materials, labor, overhead and margin, once you have real numbers from a licensed electrician, plumber or HVAC contractor to put into it.
Framing and the stud-by-stud math
Framing is 16.6 percent of construction costs, the third largest of the eight stages. This is the lumber and labor that builds the house’s structural shell: wall studs, floor and ceiling joists, rafters or roof trusses, sheathing, and the crew hours to measure, cut and set every piece of it to plan.
Framing is also the stage where this site’s own material math lines up most directly with a single NAHB percentage. Our stud count manual runs the wall framing math, stud spacing, corners, openings and waste, on your own wall dimensions, and our board feet manual handles the lumber volume side when a framing package is priced by the board foot rather than by the piece. Running either calculator against a real set of walls is the closest this breakdown gets to turning the 16.6 percent figure into a quantity you can hold.
Exterior finishes
Exterior finishes is 13.4 percent of construction costs and covers the building envelope’s outer skin: siding or exterior cladding, roofing material, exterior windows and doors, and the exterior trim that weatherproofs the seams between them. Where interior finishes dresses up the inside of the shell, exterior finishes weatherproofs and finishes the outside of the same shell, and the two stages are tracked separately because the materials, trades and schedule position differ enough to warrant it.
Two of this site’s own manuals map onto this stage directly. Our siding quantity manual works through square footage and exposure for cladding, and our shingle count manual runs the roofing square and bundle math. Both calculators size a quantity; neither one prices it, since material pricing is a local, current number this breakdown will not invent on your behalf.
Foundations and where the concrete math fits
Foundations is 10.5 percent of construction costs, the second smallest of the eight stages, ahead of only the other costs catch all. A foundation is concrete, rebar and the forming and excavation work to place both to an engineered footprint and depth, whether that is a slab, a crawl space, or a full basement.
This is the stage with the most direct calculator coverage on this entire site. Our concrete calculator and concrete slab manual size the pour itself, our rebar manual runs the reinforcement spacing, and our concrete cost reference covers pricing structure by the yard, the bag, and installed. Running a real foundation footprint through those three calculators is the closest translation this breakdown offers from the 10.5 percent national share to an actual job.
Site work
Site work is 7.6 percent of construction costs and generally covers what happens to a lot before the structure itself goes up: clearing, rough grading, excavation for the foundation, and bringing utility lines to the building. It is distinct from the finished lot cost covered earlier in this breakdown, since that figure is a top level share of the full sale price while site work is a construction stage nested inside the 64.4 percent construction total.
Our slope and grade manual and gravel quantity manual both touch pieces of this stage, grading math and the base material that often goes down ahead of a foundation or a driveway, and our land area measurement guide covers converting a lot’s dimensions between the units a site plan and a deed tend to use.
Final steps
Final steps is 6.5 percent of construction costs, the second smallest named stage. This is generally the closing phase of a build: punch list corrections, final cleanup, final grading and basic landscaping around the finished structure, and the inspections that clear the house for occupancy.
It is a smaller share than any of the stages that precede it in the build sequence, which tracks with how construction spending is typically weighted toward the middle of a project, framing through finishes, rather than toward its open and close. Our topsoil quantity manual and sod quantity manual cover the finish grading and turf side of this stage for a reader handling that piece directly rather than through a landscaping sub.
Other costs
Other costs is 2.1 percent of construction costs, the smallest of the eight stages. The NAHB survey uses this as a catch all for construction line items that do not fit cleanly into the other seven named categories, and the published figure here is the share itself with no further sub breakdown confirmed from the primary source.
A small catch all category at the bottom of an eight stage list is a normal shape for a cost survey to take, and treating 2.1 percent as evidence of something being hidden or miscounted reads more into the number than the figure supports. It is simply the remainder construction costs leave after the other seven stages are counted, with the same caveat as everywhere else on this page: nothing beyond the 2.1 percent itself is asserted as NAHB fact here.
Why foundations run 10 percent and framing runs 17
Foundations at 10.5 percent and framing at 16.6 percent are both structurally essential, both happen early in a build, and both are overseen by skilled trades, yet framing’s share runs more than half again larger. The difference comes down to material and labor intensity rather than importance, and it is worth working through because the same pattern explains several of the other gaps on this list.
A foundation pour is comparatively standardized: concrete is ordered by the yard, placed to an engineered depth and footprint, and finished in a sequence that varies little from house to house beyond the dimensions involved. Framing, by contrast, is thousands of individual pieces, each stud, joist, rafter and sheet of sheathing cut, positioned and fastened by hand across every wall, floor and roof plane in the house, with far more linear feet of material and far more billable labor hours per square foot of footprint than a single concrete pour carries. Standardization keeps a cost down; piece count and labor hours push it up, and framing simply has more of both working against it than foundations does.
The finished lot’s share of the price
The finished lot runs 13.7 percent of a home’s sale price, covered earlier in this breakdown as one of the three top level pieces alongside construction and profit. A finished lot generally means the land itself plus the work that makes it ready to build on, clearing, grading, and the permits and utility connections that turn raw acreage into a buildable site, though the NAHB figure here is a single published share rather than an itemized breakdown of what sits inside it.
Lot cost is also the figure in this entire breakdown most likely to move hardest from the national average in either direction, because land pricing is set almost entirely by local market conditions rather than by anything a construction survey can standardize across regions. Our land area measurement guide and square footage manual cover converting a lot’s own dimensions between the units a listing, a deed and a site plan tend to each use differently.
Builder profit, the margin line
Builder profit runs 11.0 percent of a home’s sale price in the NAHB’s 2024 survey, the smallest of the three top level shares. The figure is calculated as a share of the final sale price, which is a meaningfully different number than markup calculated on the builder’s cost, and the two get used interchangeably in casual conversation in a way that understates the real number.
An 11 percent margin on price works out to a larger percentage markup on cost, since cost is the smaller of the two bases the same dollar amount of profit is measured against. Builder profit in this survey also sits apart from overhead and general administrative expense, which commonly live in their own line on a builder’s income statement rather than inside the profit figure itself. Our contractor estimate manual works through the overhead and profit markup step directly, useful context for reading any quote that states its own margin.
Turning the percentages into dollars
Every percentage on this page is a share, not a dollar amount, and turning a share into a number means supplying your own budget rather than borrowing one this breakdown has not verified. The calculator on this page does exactly that: enter an illustrative construction budget and it applies the eight NAHB stage percentages to that number, plus the construction, lot and profit shares if that budget is treated as the 64.4 percent construction piece of a full sale price.
As a fully illustrative example only, never a stated NAHB dollar figure, take a 400,000 dollar construction budget. At the published shares, interior finishes would land near 96,400 dollars, major systems rough-in near 76,800, framing near 66,400, exterior finishes near 53,600, foundations near 42,000, site work near 30,400, final steps near 26,000, and other costs near 8,400. If that same 400,000 dollars represents the 64.4 percent construction share of a full sale price, the implied total price works out to roughly 621,000 dollars, with the lot near 85,100 and builder profit near 68,300. Every one of those numbers moves proportionally with whatever budget you actually enter into the calculator.
How the split moves by region, size, and finish level
The percentages on this page are a national survey average across the builders who responded, and a national average is, by definition, a number that most individual cases sit some distance away from. Three forces move an actual house away from the published shares more than any others.
Region moves the lot share hardest, since land pricing is local in a way construction labor and material costs are not, and a lot in a high demand metro market can represent a far larger share of the price than 13.7 percent while a rural lot can represent far less. Home size and layout complexity move the construction stage mix, since a more complex floor plan with more corners, more roof planes and more interior walls shifts cost toward framing and interior finishes relative to a simpler footprint of the same square footage. Finish level moves interior and exterior finishes specifically, since the survey’s 24.1 and 13.4 percent figures reflect the builders surveyed as a group, and a build specified well above or below that group’s typical finish level will carry a correspondingly different share in those two stages. None of these three forces changes the usefulness of the national figures as a starting benchmark; they change how much a single project should expect to deviate from it.
What the NAHB survey includes and leaves out
The NAHB’s Cost of Constructing a Home survey is builder reported data gathered periodically from the association’s own membership, which makes it a trade association’s survey of its members rather than a government statistical release or a database of closed transactions. That distinction matters for how the figures here should be weighted: survey responses reflect what responding builders report about their own projects, filtered through whatever sampling and methodology the association applies in a given survey year.
What the figures on this page do not claim to cover includes self-built or owner-acting-as-general-contractor projects, since the survey samples professional builders; remodeling or addition work, since the survey is scoped to new home construction; and any breakdown finer than the eight construction stages and three top level shares confirmed from the source today. For the full methodology, sample composition and any additional detail beyond what is used on this page, the NAHB’s own site, nahb.org, and its Eye on Housing economics blog are the primary source to read directly rather than a secondary summary.
Using this breakdown to check a quote or a bid
A cost breakdown like this one is a sanity check, not a substitute for a real quote. If a bid or an owner’s own running budget shows one stage consuming a share wildly out of line with its NAHB figure, interior finishes at 40 percent of construction costs instead of near 24, or framing at 5 percent instead of near 17, that gap is worth asking about before signing anything, since it may point to a scope that is missing from the bid, a stage that is being priced inconsistently with the rest, or simply a project with an unusual finish mix that deserves its own explanation.
Checking a quote this way takes the stage percentage, not a dollar figure, as the thing to compare, since the national shares are the stable part of this breakdown and the dollar total is whatever your own project costs. Our contractor estimate manual covers building a line item estimate from quantities, prices, labor and margin, our material estimation manual covers the takeoff that feeds those quantities, and our material coverage reference holds the yield and coverage figures several of those takeoffs lean on.
Common misreadings of a cost breakdown like this
A breakdown built from two different hundred percent totals, the sale price and the construction total, invites a small number of repeat mistakes, and naming them directly heads most of them off before they happen.
- Treating a stage’s percentage as a share of the sale price. Framing’s 16.6 percent is a share of construction costs, not of the full sale price, where it would be closer to 10.7 percent once the 64.4 percent construction share is applied on top.
- Assuming the three top level shares sum to 100 percent. They sum to 89.1, and the remainder is overhead, financing and sales costs not itemized in the figures confirmed here, covered earlier in this breakdown.
- Reading a national survey average as a quote for one specific house. Region, size, layout complexity and finish level all move an individual project away from the published shares, sometimes substantially.
- Confusing builder profit margin with markup on cost. An 11.0 percent margin on sale price is a larger percentage markup when the same dollar amount is measured against the smaller cost base instead.
- Assuming the eight stages are evenly weighted. They range from 24.1 percent down to 2.1, a more than tenfold spread between the largest and smallest.
The cost breakdown checklist
The whole page compressed into the check to run before using any of these figures against a real project.
- Confirm which hundred percent you are reading from. Sale price shares (construction, lot, profit) or construction cost shares (the eight stages), never both pools treated as one.
- Treat every figure as a national survey average, from the NAHB’s 2024 Cost of Constructing a Home survey, not a quote for your specific house.
- Remember the 89.1 percent gap in the top level shares, and do not assume overhead, financing and sales costs are zero just because they are not itemized here.
- Use the calculator for dollars, never a figure borrowed from this text, since every dollar amount on this page is explicitly illustrative, tied to a budget you choose.
- Expect region, size and finish level to move the real numbers, especially the lot share and the two finish stages.
- Cross check a stage percentage against a real quote before treating a large gap as normal; it may point to missing scope.
- Go to nahb.org or Eye on Housing directly for anything beyond the eight stages and three shares confirmed on this page.
Run those seven and a chart of percentages turns into an informed first read on a real budget or a real bid, rather than a number repeated without its own caveats attached.
The bottom line
The NAHB’s 2024 Cost of Constructing a Home survey gives a home’s sale price exactly three top level pieces, construction at 64.4 percent, the finished lot at 13.7, and builder profit at 11.0, and splits that construction slice into eight further stages running from interior finishes at 24.1 percent down to other costs at 2.1. Framing outrunning foundations by more than half again comes down to piece count and labor hours against a comparatively standardized pour, not to one stage mattering more than the other. What this breakdown will not do is hand over a single national average dollar total, because the survey publishes shares, not one headline price, and a confident invented total would be less useful than the honest percentages themselves.
Use the eight shares as a first pass sanity check against your own budget or a bid you have received, run the foundation and framing figures against this site’s own concrete, rebar and stud calculators for the quantities behind them, and go to the calculator on this page whenever a dollar figure, rather than a percentage, is what you actually need.
The percentages in this breakdown are reproduced from the NAHB’s 2024 Cost of Constructing a Home survey as published through the Eye on Housing economics blog, and no other statistic, sub category percentage, or national average dollar total has been added beyond what that source confirms. Every dollar figure shown here is an illustrative calculation applied to a budget the reader supplies, never a stated NAHB price. Costs vary by region, project scope, materials and current market pricing, and nothing on this page should be read as a quote, a bid, or a substitute for current figures from a licensed contractor or the primary NAHB source.
Frequently asked questions
What percentage of a home's sale price is construction cost?
64.4 percent, according to the NAHB's 2024 Cost of Constructing a Home survey, which breaks a home's final sale price into construction costs, the finished lot, and builder profit. That 64.4 percent is the slice that pays for site work, foundations, framing, systems, finishes and everything else that goes into physically building the house, as distinct from the land under it or the margin the builder keeps. It does not by itself add up to the full sale price alongside the other two published shares, because overhead, financing and sales costs sit outside all three categories and are not broken out in the figures confirmed here. Treat 64.4 percent as a national survey average across the builders who responded, not a number any single house will hit exactly.
How much of a home's price is the finished lot?
13.7 percent, per the same NAHB survey. A finished lot is the land plus the work done to make it buildable, which generally runs toward clearing, grading, and bringing utility connections to the site, though the survey's published figure is a single share rather than an itemized breakdown of what sits inside it. Lot cost is also the share most likely to swing hard from the national figure in either direction, since raw land pricing varies enormously by market, and a lot in a dense infill location can carry a far larger share of the final price than a lot in a rural subdivision.
What percentage of the sale price is builder profit?
11.0 percent, as published in the NAHB's 2024 survey. That figure is profit as a share of the final sale price, which is a different number than markup calculated on cost, and the two get confused often enough to name directly: an 11 percent margin on price is a larger markup on cost than 11 percent, because cost is the smaller base. Builder profit also sits separately from overhead and general administrative expense in most builder accounting, so this 11.0 percent sits closer to the bottom line than to a contractor estimate's gross margin line.
What share of construction costs goes to framing?
16.6 percent of the construction cost total, the third largest of the eight stages the NAHB survey breaks out, behind interior finishes and major systems rough-in. Framing covers the lumber and labor that turns a foundation into a standing, enclosed shell: studs, joists, rafters or trusses, sheathing, and the crew time to cut and set all of it. If you are pricing a framing package for an actual house rather than reading the national share, this site's own stud count manual runs the wall math on your own dimensions.
What share of construction costs goes to foundations?
10.5 percent, the second smallest of the eight stages after other costs. Foundations are concrete heavy and comparatively standardized work, poured to an engineered spec with less variation per square foot than finish work carries, which is a large part of why the share lands well below framing or interior finishes despite foundations being just as structurally necessary. For the material math behind an actual pour, this site's own concrete slab manual and concrete calculator work the volume and bag count.
Why is interior finishes the single largest construction stage?
At 24.1 percent of construction costs, interior finishes is the largest of the eight NAHB stages, and the reason is less about any one expensive material and more about how many trades and square feet it touches at once. Drywall, paint, trim, flooring, cabinetry, countertops and fixtures all fall inside this stage, each with its own material cost and its own skilled labor hours, spread across every room in the house rather than concentrated in one system or one pour. Stacking that many line items into a single stage is why it outweighs every other category, including the systems rough-in behind it.
Does this breakdown tell me how much it costs to build a house in dollars?
Not by itself. The NAHB figures used here are percentage shares of a sale price, not a single confirmed national average dollar total, and this breakdown does not publish one because that number depends on region, home size and finish level far too much to post responsibly as one figure. What the shares do let you do is turn a budget you already have, or a quote you have received, into a stage by stage check: feed an illustrative construction number into the calculator on this page and it applies the same eight percentages to show what each stage should roughly represent of that number.
Where do site work and other costs fit in the construction budget?
Site work is 7.6 percent of construction costs and generally covers what happens before the structure itself goes up, work like clearing, excavation and bringing utility lines to the building. Other costs is 2.1 percent, the survey's catch-all for construction line items that do not fit cleanly into the other seven named stages. Both are comparatively small shares next to interior finishes or framing, but the NAHB survey still tracks them separately rather than folding them into one miscellaneous line, which is part of what makes an eight-stage breakdown more useful than a single construction cost percentage on its own.